Document List by Author

Douglas Jensen of Fermi National Accelerator Laboratory is listed as an author on the following documents:

LARTPC-doc-# Title Author(s) Topic(s) Last Updated
1371-v1 Alignment report for tertiary beam Douglas Jensen Beam/Sites
13 Oct 2014
1365-v1 Project 7002 request 6847 MTest As Found_As-set Douglas Jensen Beam/Sites
LArIAT
01 Oct 2014
996-v1 Pictures of MC7 and WC progress Douglas Jensen Detector
Beam/Sites
11 Jul 2013
911-v0 Detectors for Trigger system Douglas Jensen LArIAT
08 Feb 2013
898-v0 LArIAT tertiary beam Douglas Jensen LArIAT
24 Jan 2013
818-v1 Tertiary Test Beam for Liquid Argon Detecors - preliminr Douglas Jensen Beam
13 Sep 2012
326-v2 DUSEL R&D Proposal, Liquid Argon Purity Demonstration David Finley et al. LAPD
Docs & Correspondence
14 Jun 2011
427-v1 Update on Bo Reconstruction Douglas Jensen Bo
Pattern Recognition
23 Apr 2009
420-v1 Signal Heights in Liquid Argon tracks Douglas Jensen Signal Processing
Pattern Recognition
24 Feb 2009
392-v1 Compare track resolutions using 6 point and long tracks Douglas Jensen Wires
Bo
Pattern Recognition
03 Nov 2008
389-v1 Run 137 Reconstruction with Differentiation Douglas Jensen Signal Processing
Pattern Recognition
31 Oct 2008
388-v1 Reconstruction with Carl Differentiator Douglas Jensen Signal Processing
Event Displays
27 Oct 2008
387-v1 Use of the Carl differentation in reconstruction program Douglas Jensen Signal Processing
Bo
Event Displays
23 Oct 2008
350-v3 Test of BO Electronics - getting ready for liquid Carl Bromberg et al. Front End
DAQ
Bo
10 Apr 2008
336-v1 Preliminary Analysis of Bo Pulser Data Douglas Jensen Pattern Recognition
24 Jan 2008
260-v2 Photos and Documentation for the Nitrogen Arc Cell and a write-up of calibration by summer students Reed Andrews et al. Oxygen
Purity Measurements
Instrumentation
25 Oct 2007
155-v1 Group Meeting May 13, 2006 Carl Bromberg et al. Meetings
15 Oct 2007
266-v2 Doug's LArTPC Reconstruction Status Douglas Jensen Bo
Pattern Recognition
16 May 2007
11-v1 NuSAG Submission Douglas Jensen et al. Docs & Correspondence
NuSAG
01 May 2007
50-v1 Photos of Long Wire setup at Lab 8 LAB 8 et al. Long Wire Test
Wires
Wires
19 Dec 2005

Number of documents found: 20

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, LegalFermi National Accelerator Laboratory

DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.29 usr + 0.05 sys = 0.34 CPU)