1600-v1 |
Newport Flash Lamp Power Supply Model 68826 reset procedure |
Walter Jaskierny |
Purity Monitors
|
25 Aug 2015 |
32-v2 |
LAr Purity Monitor Electronics and Electronics Bill of Materials (cost) |
Walter Jaskierny |
Instrumentation/Controls
Instrumentation
Purity Monitors
|
21 May 2013 |
655-v4 |
Documentation for LAPD PPD ES&H ORC Review |
Walter Jaskierny |
ES&H Documents
LAPD
|
07 Nov 2012 |
651-v1 |
Bo Wire-plane Photos, Geometry, Wiring and Biasing for Cold Electronics |
Daniel Edmunds et al. |
Wires
Bo
Cold Electronics
Cables/Connectors
|
04 Aug 2011 |
656-v1 |
Photos of Cold Electronics on Bo - 4/15/2011 |
Daniel Edmunds et al. |
Bo
Cold Electronics
|
19 Apr 2011 |
654-v1 |
High Voltage Testing of RG180 and RG316 |
Walter Jaskierny |
Cables/Connectors
|
12 Apr 2011 |
619-v1 |
Termination of SHV connectors to RG-180 Coaxial Cable |
Walter Jaskierny |
High Voltage
Purity Monitors
Cables/Connectors
|
26 Oct 2010 |
62-v1 |
Pictures of Feedthrough for Purity Monitor |
Walter Jaskierny et al. |
PAB setup
Purity Monitors
Feedthroughs
|
30 Sep 2010 |
591-v1 |
Hans and Walter Feed-through |
Walter Jaskierny et al. |
Feedthroughs
|
18 Jun 2010 |
223-v1 |
Purging a tank with argon gas - submitted to Long Baseline Study |
Walter Jaskierny et al. |
PAB setup
Purification (chemical and radio)
Design/Calculations
|
03 Jun 2010 |
583-v1 |
Gas Valve Controller Chassis |
Walter Jaskierny |
Instrumentation/Controls
Distillation Column
Instrumentation
|
20 May 2010 |
394-v2 |
PAB 2kVA Best UPS Installation |
Walter Jaskierny |
PAB setup
Electrics and DAQ
|
10 Mar 2010 |
559-v1 |
Tests on Ceramtec HV Feedthrough |
Walter Jaskierny |
High Voltage
Feedthroughs
|
05 Mar 2010 |
541-v1 |
A Study of Drift Times in PrM |
Walter Jaskierny et al. |
Luke
Purity Monitors
|
10 Feb 2010 |
293-v1 |
TPC Signal Feedthrough |
Walter Jaskierny |
Feedthroughs
Feedthroughs
Feedthroughs
Electrics and DAQ
|
27 Oct 2009 |
337-v1 |
PrM Feedthrus - signal and light |
Walter Jaskierny et al. |
Equipment
Light Stuff
Luke
Instrumentation
Feedthroughs
Purity Monitors
Feedthroughs
|
27 May 2009 |
259-v1 |
TPC and Electronics in Bo and summary of 1st tracks. |
Daniel Edmunds et al. |
High Voltage
Cables/Connectors
Front End
Cathode/Field cage
Bo
Feedthroughs
|
10 Mar 2009 |
241-v2 |
Pictures of TPC and feedthru flange for Bo |
Walter Jaskierny et al. |
High Voltage
Cathode/Field cage
Bo
Feedthroughs
Detectors
Wires
Feedthroughs
|
10 Nov 2008 |
229-v1 |
A Description of the TPC in Bo with a set of mechanical drawings and the internal wiring. |
Daniel Edmunds et al. |
Cathode/Field cage
Bo
Feedthroughs
Wires
Feedthroughs
Cables/Connectors
|
14 Apr 2008 |
301-v1 |
Operational Readiness Clearance for "Luke Test Installation at Proton Assembly Building" |
Walter Jaskierny et al. |
ES&H Documents
Luke
Fermilab Reviews
|
04 Dec 2007 |
216-v7 |
Work at FNAL to achieve long electron drift lifetimes - submitted to Long Baseline Study |
David Finley et al. |
PAB setup
Purity Measurements
Purification (chemical and radio)
Instrumentation
Filters
Purity Monitors
|
28 Oct 2006 |
105-v4 |
Test of new signal readout cables for PrM |
Walter Jaskierny et al. |
High Voltage
Purity Monitors
Cables/Connectors
|
27 Mar 2006 |
54-v1 |
Leakage current in long wire 15 pin connector |
Walter Jaskierny |
High Voltage
Feedthroughs
Long Wire Test
Certification
Feedthroughs
|
21 Dec 2005 |