406-v7 |
Trace Level Oxygen, Nitrogen, and Water Instrumentation Documentation |
Reed Andrews et al. |
Purity Measurements
Instrumentation
|
31 May 2018 |
2043-v1 |
Hydrogen generator at PAB Jan 2017 |
Stephen Pordes et al. |
ES&H Documents
Purity Measurements
|
06 Jan 2017 |
1671-v1 |
Updates on Lifetime measurements and Wire analysis |
Roberto Acciarri |
Purity Measurements
Analysis
|
20 Nov 2015 |
1333-v1 |
Estimate of e- lifetime during fill and early operation of the 35T Phase 1 Cryostat |
Alan A Hahn |
Instrumentation/Controls
Purity Monitors
Purity Measurements
|
21 Aug 2014 |
1218-v1 |
PrMs and the 35T Phase 1 Run |
Alan A Hahn |
Instrumentation/Controls
Purity Monitors
Purity Measurements
|
09 Apr 2014 |
706-v1 |
LAPD Purge and Recirculation Plots |
Terry Tope |
Oxygen
Nitrogen
Argon
Cleaning
LAPD
Purity Measurements
Water
|
09 Jul 2012 |
720-v1 |
LAPD Data Acquisition Primer |
Tingjun Yang |
Procedures
DAQ
LAPD
Purity Measurements
|
06 Jan 2012 |
88-v13 |
Test of Purification from Atmosphere |
Hans Jostlein et al. |
Equipment
Piping and Pumps
Purity Measurements
Instrumentation
|
16 Aug 2011 |
584-v3 |
Capillary Sampling Tubes in the LAPD Tank |
Hans Jostlein |
Instrumentation/Controls
LAPD
Purity Measurements
Instrumentation
|
14 Jun 2011 |
650-v1 |
PrM Flange on LAPD |
Terry Tope |
LAPD
Feedthroughs
Purity Measurements
|
14 Jun 2011 |
352-v15 |
Luke Data Acquisition Primer |
Stephen Pordes et al. |
Procedures
Luke
DAQ
Purity Measurements
|
04 Aug 2010 |
542-v1 |
Room Temperature Water Evolution Test |
Stephen Pordes |
Purity Measurements
Materials Tests
Materials
Instrumentation
|
15 Feb 2010 |
431-v16 |
Implicated Effects of Water on Electron Drift Lifetime |
Reed Andrews |
Luke
PAB setup
Purity Measurements
Purification (chemical and radio)
Systems
Instrumentation
|
29 Jun 2009 |
341-v17 |
PrM Summary data - continually updated |
Reed Andrews et al. |
Luke
Purity Measurements
|
16 Mar 2009 |
424-v1 |
Lifetime Plots |
Stephen Pordes |
Purity Measurements
|
16 Mar 2009 |
260-v2 |
Photos and Documentation for the Nitrogen Arc Cell and a write-up of calibration by summer students |
Reed Andrews et al. |
Oxygen
Purity Measurements
Instrumentation
|
25 Oct 2007 |
65-v1 |
Pictures of Filters under various conditions |
Cary Kendziora |
Filters
PAB setup
Yale Test
Purity Measurements
Instrumentation
|
07 Dec 2006 |
216-v7 |
Work at FNAL to achieve long electron drift lifetimes - submitted to Long Baseline Study |
David Finley et al. |
Filters
PAB setup
Purity Monitors
Purity Measurements
Purification (chemical and radio)
Instrumentation
|
28 Oct 2006 |
123-v10 |
FNAL Village Water Tank Data,Inspection Reports, Future Tasks, and Issues |
Richard Schmitt et al. |
Equipment
Piping and Pumps
Purity Measurements
Instrumentation
|
15 May 2006 |
144-v3 |
Talk on Purity Business at May 13 2006 meeting |
Stephen Pordes |
Filters
PAB setup
Purity Measurements
|
13 May 2006 |
97-v3 |
Scheme for Contaminating LAr with Nitrogen |
Terry Tope |
Design/Calculations
Design/Calculations
Purity Measurements
Materials Tests
|
27 Mar 2006 |
107-v1 |
first contamination trial |
John Krider |
Purity Measurements
|
22 Mar 2006 |
95-v1 |
First Lifetime Measurements with FNAL Monitor |
John Krider |
Purity Monitors
Purity Measurements
|
08 Mar 2006 |
92-v1 |
Monitoring liquid purity 2/28/06-3/3/06 |
John Krider |
Purity Monitors
Purity Measurements
|
03 Mar 2006 |
73-v4 |
Some slides of 1st Signals in Liquid Argon - plots from 2/3/06 and 2/10/06 and 2/20 and 2/21 |
John Krider et al. |
PAB setup
Purity Monitors
Purity Measurements
|
24 Feb 2006 |