406-v3 |
Trace_Level Instrumentation |
Reed Andrews et al. |
Purity Measurements
Instrumentation
|
01 Jul 2009 |
674-v1 |
Calculation of the water outgassing rate from the Material Test Stand |
Terry Tope |
PAB setup
Luke
Water
Instrumentation
Materials Tests
Design/Calculations
|
19 Aug 2020 |
206-v4 |
Liquid and Vapor Phase Argon- Basic data |
Author OTHER et al. |
LAr general
Argon
|
29 May 2020 |
131-v4 |
Scheme for filtering liquid argon in a single cryostat without using a mechanical pump |
Cary Kendziora et al. |
Piping and Pumps
Design/Calculations
Filters
Design/Calculations
|
17 Apr 2018 |
18-v1 |
Test Dewar Top Flange drawing |
Hans Jostlein et al. |
Cryostats
|
19 Mar 2018 |
132-v11 |
Drawings and Notes related to the implementation of Luke |
Terry Tope |
Instrumentation/Controls
Pumps and Piping
Design/Calculations
Cryostats
|
03 Mar 2018 |
2043-v1 |
Hydrogen generator at PAB Jan 2017 |
Stephen Pordes et al. |
Purity Measurements
ES&H Documents
|
06 Jan 2017 |
280-v1 |
Oxygen Filter and Molecular Sieve Information including regeneration historical data |
Cary Kendziora et al. |
Oxygen
Water
Filters
|
09 Feb 2016 |
488-v1 |
LAPD Filter Sizing |
Terry Tope |
Oxygen
Luke
Water
LAPD
Design/Calculations
Filters
Argon
|
18 Nov 2015 |
989-v1 |
Bo Seal Photos and Purchase Order |
Terry Tope |
Bo
Cryostats
|
20 Jun 2013 |
930-v2 |
LAPD talk for LArTPC (Liquid Argon Time Projection Chamber Detector) R&D Workshop |
Terry Tope |
LAPD
Talks
|
05 May 2013 |
265-v44 |
Cryogenic Safety Report for PAB in presence of Luke and Bo, and PMT test, Distillation Column, Condenser Booster, and Cold Trap |
David Montanari et al. |
Cryogenics
ES&H Documents
Luke
Bo
Design/Calculations
|
25 Mar 2013 |
553-v126 |
Liquid Argon Purity Demonstration (LAPD) Cryogenic Safety Report |
Mark Adamowski et al. |
ES&H Documents
LAPD
Design/Calculations
Cryostats
|
20 Dec 2012 |
38-v9 |
Misc. Engineering Property Values, Conversions, and Hardware Manuals |
Terry Tope |
References
|
27 Mar 2006 |
868-v5 |
LAPD Run II ORC Review Findings |
Terry Tope et al. |
ES&H Documents
LongBow
Trigger
Electrics and DAQ
|
06 Dec 2012 |
860-v6 |
Safety Documentation for Long Bo |
Carl Bromberg et al. |
High Voltage
ES&H Documents
LongBow
Trigger
Electrics and DAQ
|
30 Nov 2012 |
744-v2 |
Long Bo Feedthrough Design and flanges |
Hans Jostlein et al. |
Feedthroughs
LAPD
LongBow
|
30 Aug 2012 |
706-v1 |
LAPD Purge and Recirculation Plots |
Terry Tope |
Oxygen
Purity Measurements
Water
LAPD
Cleaning
Nitrogen
Argon
|
09 Jul 2012 |
30-v2 |
Wide Mouth Dewar Top Flange |
Hans Jostlein et al. |
Feedthroughs
Cryostats
|
31 Jan 2006 |
88-v13 |
Test of Purification from Atmosphere |
Hans Jostlein et al. |
Equipment
Purity Measurements
Piping and Pumps
Instrumentation
|
16 Aug 2011 |
356-v1 |
ORC Stuff for Bo |
Author OTHER et al. |
ES&H Documents
Fermilab Reviews
Bo
|
25 Jul 2011 |
650-v1 |
PrM Flange on LAPD |
Terry Tope |
Purity Measurements
LAPD
Feedthroughs
|
14 Jun 2011 |
642-v1 |
Effort needed to complete the Liquid Argon Purity Demonstrator |
Rob Plunkett et al. |
LAPD
|
14 Jun 2011 |
67-v2 |
PAB Setups - photos, schematics, people. |
Reed Andrews et al. |
PAB setup
Instrumentation/Controls
Luke
Bo
Materials Tests
Filters
|
08 Jun 2011 |
430-v11 |
Estimated Capacity of MTS Oxygen Filter |
Reed Andrews et al. |
Luke
Bo
Filters
|
08 Jun 2011 |
547-v8 |
LAPD in PC4 - area pictures & layout sketches |
Mark Adamowski et al. |
Cryogenics
LAPD
Site Design
|
05 May 2011 |
352-v15 |
Luke Data Acquisition Primer |
Stephen Pordes et al. |
Purity Measurements
Luke
Procedures
DAQ
|
04 Aug 2010 |
223-v1 |
Purging a tank with argon gas - submitted to Long Baseline Study |
Walter Jaskierny et al. |
PAB setup
Purification (chemical and radio)
Design/Calculations
|
03 Jun 2010 |
542-v1 |
Room Temperature Water Evolution Test |
Stephen Pordes |
Purity Measurements
Instrumentation
Materials Tests
Materials
|
15 Feb 2010 |
440-v1 |
PAB flow schematics and component lists |
Terry Tope |
Instrumentation/Controls
Luke
Bo
|
19 Jun 2009 |
283-v5 |
Materials Test Station ("Luke") Operational Data |
Cary Kendziora et al. |
Instrumentation/Controls
Luke
|
20 May 2008 |
339-v2 |
LAr and LN2 Saturation Temperatures, Argon Melt Point as a function of Pressure |
Richard Schmitt et al. |
LN general
References
LAr general
|
24 Feb 2008 |
301-v1 |
Operational Readiness Clearance for "Luke Test Installation at Proton Assembly Building" |
Walter Jaskierny et al. |
ES&H Documents
Luke
Fermilab Reviews
|
04 Dec 2007 |
260-v2 |
Photos and Documentation for the Nitrogen Arc Cell and a write-up of calibration by summer students |
Reed Andrews et al. |
Oxygen
Purity Measurements
Instrumentation
|
25 Oct 2007 |
155-v1 |
Group Meeting May 13, 2006 |
Carl Bromberg et al. |
Meetings
|
15 Oct 2007 |
296-v1 |
Work list for a minimal system to bring clean liquid to "Bo" |
Terry Tope |
LAr general
Design/Calculations
|
08 Aug 2007 |
91-v2 |
Single Filter Pass Contamination Parameters |
Terry Tope |
LAr general
Filters
Design/Calculations
|
20 Oct 2006 |
207-v1 |
Drawings and Notes related to the implementation of Bo (cousin of Luke) |
Terry Tope |
Feedthroughs
|
20 Sep 2006 |
196-v1 |
Sketches and notes related to a vertical implementation of the 5 meter drift cryostat. |
Hans Jostlein et al. |
5 meter drift
5 meter drift
Cryostats
|
03 Aug 2006 |
104-v3 |
Run and Procedure sheets for liquid argon fills at PAB |
Stephen Pordes et al. |
PAB setup
Procedures
|
25 May 2006 |
123-v10 |
FNAL Village Water Tank Data,Inspection Reports, Future Tasks, and Issues |
Richard Schmitt et al. |
Equipment
Purity Measurements
Piping and Pumps
Instrumentation
|
15 May 2006 |
97-v3 |
Scheme for Contaminating LAr with Nitrogen |
Terry Tope |
Purity Measurements
Design/Calculations
Materials Tests
Design/Calculations
|
27 Mar 2006 |
111-v3 |
Scheme for filtering a self contained cryostat that maximizes TPC space. |
Terry Tope |
Filters
Cryostats
|
24 Mar 2006 |
110-v2 |
Saturated Liquid Argon Contamination Mixtures - Contaminant Phase Preferences |
Terry Tope |
Design/Calculations
|
23 Mar 2006 |
45-v4 |
Purity Station Flow Schematics and System Description |
Terry Tope |
PAB setup
Instrumentation/Controls
Pumps and Piping
Piping and Pumps
Systems
Instrumentation
Cryostats
|
05 Mar 2006 |
73-v4 |
Some slides of 1st Signals in Liquid Argon - plots from 2/3/06 and 2/10/06 and 2/20 and 2/21 |
John Krider et al. |
PAB setup
Purity Measurements
Purity Monitors
|
24 Feb 2006 |
71-v1 |
Pictures of lowered position of PrM and filter dust at bottom of cryostat |
Stephen Pordes et al. |
PAB setup
Equipment
Purity Monitors
|
01 Feb 2006 |