406-v3 |
Trace_Level Instrumentation |
Reed Andrews et al. |
Purity Measurements
Instrumentation
|
01 Jul 2009 |
4329-v1 |
DarkSide @ PAB |
Cary Kendziora |
Cryogenics
|
20 Nov 2019 |
65-v1 |
Pictures of Filters under various conditions |
Cary Kendziora |
Yale Test
PAB setup
Purity Measurements
Instrumentation
Filters
|
08 Apr 2019 |
131-v4 |
Scheme for filtering liquid argon in a single cryostat without using a mechanical pump |
Cary Kendziora et al. |
Piping and Pumps
Design/Calculations
Filters
Design/Calculations
|
17 Apr 2018 |
18-v1 |
Test Dewar Top Flange drawing |
Hans Jostlein et al. |
Cryostats
|
19 Mar 2018 |
1974-v1 |
Drawings of Lazy Susan (Carousel) and motion mechanism in TallBo |
Cary Kendziora |
TallBo
Lazy Susan
Bars
|
26 Sep 2016 |
1913-v1 |
Cary photos of Luke motor control settings on 7-15-2016 |
Cary Kendziora |
Mechanics
Luke
|
16 Jul 2016 |
280-v1 |
Oxygen Filter and Molecular Sieve Information including regeneration historical data |
Cary Kendziora et al. |
Oxygen
Water
Filters
|
09 Feb 2016 |
1115-v1 |
Articulated Arm original conceptual design |
Cary Kendziora |
Talks
|
18 Nov 2013 |
843-v2 |
Scene and Raising Fixture Drawings and photos at Notre Dame |
Cary Kendziora |
Scene
Detector
|
22 Feb 2013 |
854-v1 |
Scene on its Raising Fixture Photos |
Cary Kendziora |
Scene
Detector
|
25 Oct 2012 |
30-v2 |
Wide Mouth Dewar Top Flange |
Hans Jostlein et al. |
Feedthroughs
Cryostats
|
31 Jan 2006 |
729-v1 |
Scene Argon System Conceptual Drawing |
Cary Kendziora |
Scene
Detector
|
27 Feb 2012 |
649-v1 |
PrM Insertion in LAPD photos and schematics |
Cary Kendziora |
LAPD
Feedthroughs
Purity Monitors
|
15 Jun 2011 |
351-v1 |
Three Fiber PrM setup pictures |
Cary Kendziora et al. |
Light Stuff
Photocathodes
LAPD
Purity Monitors
|
14 Jun 2011 |
67-v2 |
PAB Setups - photos, schematics, people. |
Reed Andrews et al. |
PAB setup
Instrumentation/Controls
Luke
Bo
Materials Tests
Filters
|
08 Jun 2011 |
62-v1 |
Pictures of Feedthrough for Purity Monitor |
Walter Jaskierny et al. |
PAB setup
Purity Monitors
Feedthroughs
|
30 Sep 2010 |
524-v1 |
Distillation Column Photos |
Henning Back et al. |
Distillation Column
Distillation Column
Depleted Argon
Dark Matter
|
24 Aug 2010 |
542-v1 |
Room Temperature Water Evolution Test |
Stephen Pordes |
Purity Measurements
Instrumentation
Materials Tests
Materials
|
15 Feb 2010 |
562-v1 |
Distillation Column Bellows Pressure Test |
Cary Kendziora |
ES&H Documents
Depleted Argon
|
09 Mar 2010 |
556-v1 |
Procedure for reprogramming Lukes elevator controller. |
Cary Kendziora et al. |
Instrumentation
Materials Tests
|
01 Mar 2010 |
480-v1 |
BeastieBoy Filter Schematic Drawing |
Cary Kendziora |
Pumps and Piping
Bo
Filters
|
18 Nov 2009 |
337-v1 |
PrM Feedthrus - signal and light |
Walter Jaskierny et al. |
Equipment
Light Stuff
Luke
Instrumentation
Feedthroughs
Purity Monitors
Feedthroughs
|
27 May 2009 |
259-v1 |
TPC and Electronics in Bo and summary of 1st tracks. |
Daniel Edmunds et al. |
High Voltage
Cables/Connectors
Front End
Cathode/Field cage
Bo
Feedthroughs
|
10 Mar 2009 |
283-v5 |
Materials Test Station ("Luke") Operational Data |
Cary Kendziora et al. |
Instrumentation/Controls
Luke
|
20 May 2008 |
349-v1 |
Photos of Fiber and Dust on Luke PrM 3_24_08 |
Cary Kendziora |
Luke
Purity Monitors
|
31 Mar 2008 |
334-v1 |
Luke Disassembly Clocking Pictures |
Cary Kendziora |
Mechanics
Luke
Cryostats
|
08 Jan 2008 |
322-v1 |
Materials Tested |
Cary Kendziora |
Materials Tests
|
07 Dec 2007 |
301-v1 |
Operational Readiness Clearance for "Luke Test Installation at Proton Assembly Building" |
Walter Jaskierny et al. |
ES&H Documents
Luke
Fermilab Reviews
|
04 Dec 2007 |
216-v7 |
Work at FNAL to achieve long electron drift lifetimes - submitted to Long Baseline Study |
David Finley et al. |
PAB setup
Purity Measurements
Purification (chemical and radio)
Instrumentation
Filters
Purity Monitors
|
28 Oct 2006 |
51-v1 |
ICARUS and FNAL PrM and photocathode photos, CLK Drawing, Electrical Schematics |
Coll. ICARUS et al. |
Purity Monitors
|
27 Feb 2006 |
60-v1 |
RGA studies of test dewar - Jan9/10 |
Cary Kendziora et al. |
PAB setup
|
19 Jan 2006 |