375-v1 |
Mass calculation for 10 ft tall x 10 ft diameter tank |
David Finley |
LAPD
|
14 Jun 2011 |
326-v2 |
DUSEL R&D Proposal, Liquid Argon Purity Demonstration |
David Finley et al. |
LAPD
Docs & Correspondence
|
14 Jun 2011 |
160-v20 |
Cosmic Ray Collection |
David Finley et al. |
DAQ
Big Tank
Cosmic Rays
Pattern Recognition
|
07 Mar 2011 |
341-v17 |
PrM Summary data - continually updated |
Reed Andrews et al. |
Purity Measurements
Luke
|
16 Mar 2009 |
248-v2 |
Muon Lifetime in Liquid Argon |
David Finley et al. |
Physics
|
20 Mar 2008 |
323-v1 |
R&D on 100kton Liquid Argon Time Projection Chambers and Physics Potential |
David Finley et al. |
Talks
|
15 Nov 2007 |
155-v1 |
Group Meeting May 13, 2006 |
Carl Bromberg et al. |
Meetings
|
15 Oct 2007 |
315-v2 |
100kton design |
David Finley |
Big Tank
|
11 Oct 2007 |
313-v5 |
Large Liquid Argon Detector R&D in the US |
David Finley |
Systems
Talks
|
08 Oct 2007 |
278-v1 |
R&D for an Ash River LAr Detector ... and beyond |
David Finley |
Yale Test
T962
LAPD
Bo
Big Tank
Talks
Materials Tests
1-3 kton
PAB setup
Luke
130 ton
|
18 Sep 2007 |
253-v3 |
LaThuile talk by Finley March 2007 |
David Finley |
Talks
|
18 Sep 2007 |
185-v1 |
Steps Toward the Big Detector |
David Finley |
Meetings
Talks
|
27 Jul 2007 |
274-v1 |
Using Liquid Argon Time Projection Chambers in Fermilabs Neutrino Beams |
David Finley |
T962
LAPD
Docs & Correspondence
1-3 kton
130 ton
NuMI Beam
MiniBoone Beam
|
29 May 2007 |
268-v1 |
Liquid Argon TPC in the SciBooNE Hall |
David Finley |
MiniBoone Beam
Systems
|
23 May 2007 |
218-v1 |
LAr R & D plan submitted to NuSAG |
David Finley et al. |
Docs & Correspondence
NuSAG
|
01 May 2007 |
11-v1 |
NuSAG Submission |
Douglas Jensen et al. |
Docs & Correspondence
NuSAG
|
01 May 2007 |
262-v1 |
"Liquid Argon TPC R&D (Fermilab perspective)" to KEK Directorate |
David Finley |
Meetings
|
30 Apr 2007 |
249-v1 |
Measurements of three epoxies at cryogenic temperatures |
David Finley et al. |
References
|
07 Feb 2007 |
152-v4 |
May 2006 DOE Review of Fermilab |
David Finley et al. |
External Reviews
|
14 Dec 2006 |
216-v7 |
Work at FNAL to achieve long electron drift lifetimes - submitted to Long Baseline Study |
David Finley et al. |
Purity Measurements
PAB setup
Purification (chemical and radio)
Instrumentation
Filters
Purity Monitors
|
28 Oct 2006 |
211-v2 |
Liquid Argon TPC Activities at Fermilab etc |
David Finley |
Detectors
Big Tank
Talks
Materials Tests
1-3 kton
PAB setup
5 meter drift
Purity Monitors
Wires
|
22 Sep 2006 |
195-v3 |
Presentations to PPD Engineering Meeting July 24, 2006 by DF and SP |
David Finley et al. |
Talks
Fermilab Reviews
|
24 Jul 2006 |
137-v1 |
Talk presented to Fermilab DOE Annual Review |
David Finley |
External Reviews
|
08 Jul 2006 |
182-v1 |
LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam |
David Finley |
Talks
|
08 Jul 2006 |
178-v4 |
LArTPC Design and Cost Considerations |
David Finley |
Meetings
|
27 Jun 2006 |