674-v1 |
Calculation of the water outgassing rate from the Material Test Stand |
Terry Tope |
Luke
PAB setup
Design/Calculations
Materials Tests
Water
Instrumentation
|
19 Aug 2020 |
4682-v3 |
Status of GOAT |
Tanaz Mohayai |
PAB setup
Detectors
Instrumentation
|
29 Jul 2020 |
4633-v1 |
LAr Supply Line and Filters P&ID |
Kathrine Laureto |
LAr general
PAB setup
|
13 Jul 2020 |
4190-v1 |
GOAT Activities at PAB |
Tanaz Mohayai |
PAB setup
Detectors
Instrumentation
|
16 Oct 2019 |
65-v1 |
Pictures of Filters under various conditions |
Cary Kendziora |
Filters
PAB setup
Yale Test
Purity Measurements
Instrumentation
|
08 Apr 2019 |
210-v1 |
Lukes Inners |
Ewa Skup |
PAB setup
Purity Monitors
Equipment
Materials Tests
Systems
Instrumentation
|
17 Jan 2018 |
2059-v1 |
Proposed Liquid Argon Dewar and Vacuum Jacketed Piping for PAB |
Fritz Schwartz |
PAB setup
|
06 Feb 2017 |
1658-v1 |
PAB Dry Pump Inventory |
Ron P Davis |
Pumps and Piping
PAB setup
Mechanics
|
05 Nov 2015 |
793-v1 |
Talk on LAr at DOE Review of Labs R & D 7-24-2012 |
Stephen Pordes |
LArIAT
Distillation Column
Luke
PAB setup
External Reviews
LAPD
T962
Scene
Bo
Talks
ArgoNeuT
|
08 Oct 2012 |
701-v2 |
Material for R&D Pres. to PAC by E.Ramberg 11/11 |
Stephen Pordes |
Dark Matter
Fermilab Reviews
PAB setup
Cold Electronics
T962
LArSoft
Bo
|
23 Nov 2011 |
67-v2 |
PAB Setups - photos, schematics, people. |
Reed Andrews et al. |
Luke
Filters
PAB setup
Instrumentation/Controls
Bo
Materials Tests
|
08 Jun 2011 |
62-v1 |
Pictures of Feedthrough for Purity Monitor |
Walter Jaskierny et al. |
Feedthroughs
PAB setup
Purity Monitors
|
30 Sep 2010 |
223-v1 |
Purging a tank with argon gas - submitted to Long Baseline Study |
Walter Jaskierny et al. |
PAB setup
Design/Calculations
Purification (chemical and radio)
|
03 Jun 2010 |
394-v2 |
PAB 2kVA Best UPS Installation |
Walter Jaskierny |
PAB setup
Electrics and DAQ
|
10 Mar 2010 |
431-v16 |
Implicated Effects of Water on Electron Drift Lifetime |
Reed Andrews |
Luke
PAB setup
Purity Measurements
Purification (chemical and radio)
Systems
Instrumentation
|
29 Jun 2009 |
409-v3 |
Talks at PPD Review/Briefing/Workshop on LAr R&D 1/26/09 |
Stephen Pordes |
Fermilab Reviews
PAB setup
Systems
|
01 Aug 2009 |
320-v1 |
Complete set of drawings for Luke/Bo condenser |
Ben Hansen |
Luke
PAB setup
Instrumentation/Controls
Cooling
Bo
Cryostats
|
17 Nov 2008 |
278-v1 |
R&D for an Ash River LAr Detector ... and beyond |
David Finley |
Luke
Big Tank
PAB setup
Yale Test
LAPD
1-3 kton
130 ton
T962
Bo
Talks
Materials Tests
|
18 Sep 2007 |
287-v1 |
Slides for Lab party 8/3/2007 |
Stephen Pordes |
Docs & Correspondence
PAB setup
|
30 Jul 2007 |
216-v7 |
Work at FNAL to achieve long electron drift lifetimes - submitted to Long Baseline Study |
David Finley et al. |
Filters
PAB setup
Purity Monitors
Purity Measurements
Purification (chemical and radio)
Instrumentation
|
28 Oct 2006 |
211-v2 |
Liquid Argon TPC Activities at Fermilab etc |
David Finley |
Wires
Detectors
Big Tank
PAB setup
Purity Monitors
1-3 kton
5 meter drift
Talks
Materials Tests
|
22 Sep 2006 |
104-v3 |
Run and Procedure sheets for liquid argon fills at PAB |
Stephen Pordes et al. |
Procedures
PAB setup
|
25 May 2006 |
144-v3 |
Talk on Purity Business at May 13 2006 meeting |
Stephen Pordes |
Filters
PAB setup
Purity Measurements
|
13 May 2006 |
45-v4 |
Purity Station Flow Schematics and System Description |
Terry Tope |
Pumps and Piping
PAB setup
Instrumentation/Controls
Piping and Pumps
Systems
Instrumentation
Cryostats
|
05 Mar 2006 |
46-v1 |
pictures of cryostat top |
Stephen Pordes |
Pumps and Piping
PAB setup
Cryostats
|
28 Feb 2006 |
73-v4 |
Some slides of 1st Signals in Liquid Argon - plots from 2/3/06 and 2/10/06 and 2/20 and 2/21 |
John Krider et al. |
PAB setup
Purity Monitors
Purity Measurements
|
24 Feb 2006 |
71-v1 |
Pictures of lowered position of PrM and filter dust at bottom of cryostat |
Stephen Pordes et al. |
PAB setup
Purity Monitors
Equipment
|
01 Feb 2006 |
69-v1 |
Liquid Argon Condensers and Purification Scheme for PAB setup |
Ben Hansen |
Filters
PAB setup
Equipment
|
30 Jan 2006 |
61-v2 |
FNAL monitor anode to grid gap study |
John Krider |
PAB setup
Purity Monitors
|
20 Jan 2006 |
57-v5 |
RGA scans of test dewar of dec 24 2005 to jan 4 2006 |
Petros Rapidis |
PAB setup
|
19 Jan 2006 |
60-v1 |
RGA studies of test dewar - Jan9/10 |
Cary Kendziora et al. |
PAB setup
|
19 Jan 2006 |
56-v2 |
Nickel Photocathode Data of 12-23-05 and 12-29-05 |
John Krider et al. |
PAB setup
Purity Monitors
Instrumentation
|
29 Dec 2005 |
44-v1 |
PrM Grid data |
John Krider |
PAB setup
Purity Monitors
Instrumentation
|
05 Dec 2005 |
37-v1 |
Photos of mounting of FNAL PrM in cryostat, some photos of Icarus PrM |
Stephen Pordes |
PAB setup
Purity Monitors
Instrumentation
|
10 Nov 2005 |