395-v5 |
Pulse Shaping Studies using the FFT |
Carl Bromberg et al. |
Detector Response
T962
Bo
ArgoNeuT
Front End
Pattern Recognition
Detector Capability
Signal Processing
|
07 Feb 2020 |
4323-v3 |
PAB Status |
Alan A Hahn |
ICEBERG
Blanche
Systems
Bo
Luke
|
20 Nov 2019 |
989-v1 |
Bo Seal Photos and Purchase Order |
Terry Tope |
Bo
Cryostats
|
20 Jun 2013 |
265-v44 |
Cryogenic Safety Report for PAB in presence of Luke and Bo, and PMT test, Distillation Column, Condenser Booster, and Cold Trap |
David Montanari et al. |
ES&H Documents
Bo
Design/Calculations
Luke
Cryogenics
|
25 Mar 2013 |
931-v1 |
From Warm to Cold |
Carl Bromberg |
Bo
ArgoNeuT
Front End
LongBow
Cold Electronics
|
21 Mar 2013 |
837-v1 |
Electrostatic modeling of Faraday cups on HV Feedthroughs |
Hans Jostlein et al. |
Feedthroughs
Cathode/Field cage
Feedthroughs
Bo
Feedthroughs
High Voltage
LongBow
LAPD
Detector
Detectors
|
07 Feb 2013 |
793-v1 |
Talk on LAr at DOE Review of Labs R & D 7-24-2012 |
Stephen Pordes |
PAB setup
External Reviews
T962
Bo
ArgoNeuT
LArIAT
Distillation Column
Luke
LAPD
Scene
Talks
|
08 Oct 2012 |
820-v2 |
Cold Electronics for Phase 1 |
Carl Bromberg |
DAQ
Bo
ArgoNeuT
Front End
LongBow
Cold Electronics
|
04 Oct 2012 |
819-v1 |
Progress in US LArTPC technology at GLA2010 and GLA2011 |
Carl Bromberg |
NuMI Beam
Feedthroughs
DAQ
Detectors
Reconstruction
Cosmic Rays
T962
Bo
ArgoNeuT
Front End
Instrumentation
Cables/Connectors
Event Displays
Signal Processing
NuMI Beam
Cold Electronics
Detector
|
28 Aug 2012 |
735-v1 |
Long Bo in LAPD Drawings |
Hans Jostlein |
Cables/Connectors
Cathode/Field cage
Feedthroughs
Bo
LAPD
Detector
|
14 Jun 2012 |
258-v1 |
Bo HV Supply and Lead |
Hans Jostlein |
Bo
High Voltage
|
18 May 2012 |
750-v1 |
Bo for MicroBooNE PMT testing |
Stephen Pordes |
Bo
PMT stuff
|
12 Apr 2012 |
30-v2 |
Wide Mouth Dewar Top Flange |
Hans Jostlein et al. |
Feedthroughs
Cryostats
|
31 Jan 2006 |
701-v2 |
Material for R&D Pres. to PAC by E.Ramberg 11/11 |
Stephen Pordes |
PAB setup
T962
Bo
Dark Matter
Fermilab Reviews
Cold Electronics
LArSoft
|
23 Nov 2011 |
651-v1 |
Bo Wire-plane Photos, Geometry, Wiring and Biasing for Cold Electronics |
Daniel Edmunds et al. |
Bo
Cables/Connectors
Wires
Cold Electronics
|
04 Aug 2011 |
356-v1 |
ORC Stuff for Bo |
Author OTHER et al. |
ES&H Documents
Bo
Fermilab Reviews
|
25 Jul 2011 |
671-v3 |
MSU Activities LArTPC Electronics development at FNAL |
Carl Bromberg |
Bo
ArgoNeuT
Front End
Cold Electronics
|
27 Jun 2011 |
67-v2 |
PAB Setups - photos, schematics, people. |
Reed Andrews et al. |
Filters
PAB setup
Bo
Materials Tests
Luke
Instrumentation/Controls
|
08 Jun 2011 |
430-v11 |
Estimated Capacity of MTS Oxygen Filter |
Reed Andrews et al. |
Filters
Bo
Luke
|
08 Jun 2011 |
667-v1 |
Bo Cold DAQ Safety Review Documents |
Daniel Edmunds |
Bo
Cold Electronics
|
26 May 2011 |
664-v1 |
Data from In-Liquid Electronics |
Daniel Edmunds |
Bo
Cold Electronics
|
18 May 2011 |
656-v1 |
Photos of Cold Electronics on Bo - 4/15/2011 |
Daniel Edmunds et al. |
Bo
Cold Electronics
|
19 Apr 2011 |
594-v1 |
A Modular Readout System for A Small Liquid Argon TPC - June 23, 2006 |
Carl Bromberg et al. |
DAQ
Bo
Front End
|
27 Jun 2010 |
555-v1 |
MSU LArTPC Cold Electronics for LBNE |
Carl Bromberg et al. |
T962
Bo
ArgoNeuT
LBNE
Cold Electronics
|
28 Feb 2010 |
481-v1 |
Slides for Mitch |
Stephen Pordes |
Bo
Materials Tests
Luke
|
19 Nov 2009 |
480-v1 |
BeastieBoy Filter Schematic Drawing |
Cary Kendziora |
Filters
Bo
Pumps and Piping
|
18 Nov 2009 |
440-v1 |
PAB flow schematics and component lists |
Terry Tope |
Bo
Luke
Instrumentation/Controls
|
19 Jun 2009 |
427-v1 |
Update on Bo Reconstruction |
Douglas Jensen |
Bo
Pattern Recognition
|
23 Apr 2009 |
393-v13 |
Bo Run Info |
Reed Andrews |
Bo
|
09 Apr 2009 |
259-v1 |
TPC and Electronics in Bo and summary of 1st tracks. |
Daniel Edmunds et al. |
Cables/Connectors
Cathode/Field cage
Feedthroughs
Bo
Front End
High Voltage
|
10 Mar 2009 |
412-v1 |
Fermilab LAr Review Talk |
Carl Bromberg |
Bo
Fermilab Reviews
New Beams
Event Displays
Instrumentation/Controls
Cold Electronics
|
26 Jan 2009 |
320-v1 |
Complete set of drawings for Luke/Bo condenser |
Ben Hansen |
PAB setup
Cooling
Bo
Cryostats
Luke
Instrumentation/Controls
|
17 Nov 2008 |
241-v2 |
Pictures of TPC and feedthru flange for Bo |
Walter Jaskierny et al. |
Feedthroughs
Feedthroughs
Bo
Cathode/Field cage
Wires
High Voltage
Detectors
|
10 Nov 2008 |
392-v1 |
Compare track resolutions using 6 point and long tracks |
Douglas Jensen |
Bo
Pattern Recognition
Wires
|
03 Nov 2008 |
387-v1 |
Use of the Carl differentation in reconstruction program |
Douglas Jensen |
Bo
Event Displays
Signal Processing
|
23 Oct 2008 |
379-v1 |
Bo Noise Studies |
Brian J Rebel |
DAQ
Bo
Analysis
|
25 Sep 2008 |
370-v18 |
Some plots of Run 73 |
Carl Bromberg et al. |
Bo
Electrics and DAQ
|
08 Sep 2008 |
229-v1 |
A Description of the TPC in Bo with a set of mechanical drawings and the internal wiring. |
Daniel Edmunds et al. |
Feedthroughs
Cathode/Field cage
Feedthroughs
Bo
Cables/Connectors
Wires
|
14 Apr 2008 |
235-v1 |
Description of Bo TPC and Electronics |
Daniel Edmunds et al. |
DAQ
Bo
Front End
Pattern Recognition
|
14 Apr 2008 |
350-v3 |
Test of BO Electronics - getting ready for liquid |
Carl Bromberg et al. |
DAQ
Bo
Front End
|
10 Apr 2008 |
348-v1 |
Processing of Gas Signals in BO |
Bruce R Baller et al. |
Bo
Signal Processing
|
31 Mar 2008 |
278-v1 |
R&D for an Ash River LAr Detector ... and beyond |
David Finley |
Big Tank
PAB setup
1-3 kton
130 ton
T962
Bo
Materials Tests
Luke
Yale Test
LAPD
Talks
|
18 Sep 2007 |
209-v1 |
16 Channel Pre-Amplifier Mother Board for the LArTPC Test Cryostat |
Daniel Edmunds |
DAQ
Bo
Front End
Electrics and DAQ
|
25 Jun 2007 |
267-v2 |
T962 Electronics |
Carl Bromberg |
T962
Bo
Instrumentation
Front End
Electrics and DAQ
|
17 May 2007 |
266-v2 |
Doug's LArTPC Reconstruction Status |
Douglas Jensen |
Bo
Pattern Recognition
|
16 May 2007 |
245-v1 |
MSU electronics developments for Liquid Argon TPC |
Carl Bromberg |
DAQ
Bo
Front End
Electrics and DAQ
|
03 Mar 2007 |
208-v1 |
Cryostat Ground Notes |
Daniel Edmunds et al. |
DAQ
Bo
Front End
Detectors
|
02 Dec 2006 |