131-v4 |
Scheme for filtering liquid argon in a single cryostat without using a mechanical pump |
Cary Kendziora et al. |
Design/Calculations
Design/Calculations
Piping and Pumps
Filters
|
17 Apr 2018 |
132-v11 |
Drawings and Notes related to the implementation of Luke |
Terry Tope |
Pumps and Piping
Design/Calculations
Instrumentation/Controls
Cryostats
|
03 Mar 2018 |
1983-v1 |
Simulation of Filling Tank with Argon |
Zhijing Tang |
Design/Calculations
Feedthroughs
Cryostats
|
05 Oct 2016 |
1958-v2 |
35 Ton Ullage Questions |
Alan A Hahn |
LAr general
Design/Calculations
Argon
Instrumentation/Controls
|
07 Sep 2016 |
488-v1 |
LAPD Filter Sizing |
Terry Tope |
LAPD
Design/Calculations
Oxygen
Luke
Filters
Argon
Water
|
18 Nov 2015 |
895-v2 |
Ions in Long Bo |
Hans Jostlein et al. |
LAr general
LAPD
Design/Calculations
LongBow
|
14 Nov 2014 |
635-v4 |
LAPD Cryostat Interior Temperatures - RTD measurements and CFD models of Liquid and Gas Temperatures |
Erik A Voirin |
LAr general
Design/Calculations
Insulation
Cryostats
|
24 Jan 2014 |
265-v44 |
Cryogenic Safety Report for PAB in presence of Luke and Bo, and PMT test, Distillation Column, Condenser Booster, and Cold Trap |
David Montanari et al. |
ES&H Documents
Design/Calculations
Luke
Cryogenics
Bo
|
25 Mar 2013 |
553-v126 |
Liquid Argon Purity Demonstration (LAPD) Cryogenic Safety Report |
Mark Adamowski et al. |
ES&H Documents
LAPD
Design/Calculations
Cryostats
|
20 Dec 2012 |
791-v1 |
PT-1000 testing in LN2 and LAr |
Thomas Alexander et al. |
LAr general
Design/Calculations
Scene
Detector
|
31 Jul 2012 |
477-v2 |
LAPD Preliminary Condenser |
Mark Adamowski et al. |
LAPD
Design/Calculations
|
24 Feb 2010 |
475-v2 |
LAPD Tank Absorbed Heat |
Mark Adamowski |
LAPD
Design/Calculations
|
15 Dec 2009 |
476-v2 |
LAPD Condenser Heat Transfer Area |
Mark Adamowski |
LAPD
Design/Calculations
|
15 Dec 2009 |
282-v2 |
Cryogenic Safety Report for T962 |
Robert Sanders |
ES&H Documents
Design/Calculations
Fermilab Reviews
T962
|
04 Mar 2008 |
325-v1 |
Temperature Distribution in MicroBoone Detector |
Richard Schmitt et al. |
Design/Calculations
|
20 Nov 2007 |
296-v1 |
Work list for a minimal system to bring clean liquid to "Bo" |
Terry Tope |
LAr general
Design/Calculations
|
08 Aug 2007 |
217-v1 |
Review of Cryogenic Thermal Systems - NASA |
Author OTHER |
References
Design/Calculations
Cryostats
|
26 Oct 2006 |
97-v3 |
Scheme for Contaminating LAr with Nitrogen |
Terry Tope |
Design/Calculations
Design/Calculations
Purity Measurements
Materials Tests
|
27 Mar 2006 |
58-v1 |
LAr TPC Wire Experiments - Presentation and Write Up |
Ben Hansen |
Design/Calculations
Long Wire Test
Long Wire Test
Cryostats
|
28 Feb 2006 |
64-v1 |
Presentation to AD Cryo Group on Long Wire setup |
Ben Hansen |
Design/Calculations
Long Wire Test
Long Wire Test
Cryostats
|