Search Results

LARTPC-doc-# Title Author(s) Topic(s) Last Updated
4649-v1 Tall Bo Primary Relief Valve Refurbishment - Test Results Kathrine Laureto TallBo
20 Jul 2020
395-v5 Pulse Shaping Studies using the FFT Carl Bromberg et al. Detector Response
Pattern Recognition
Detector Capability
Signal Processing
T962
Bo
ArgoNeuT
Front End
07 Feb 2020
1853-v1 Tall Bo meeting April, 27 2016 Stefano Vergani LAr general
Detectors
Scintillator
27 Apr 2016
895-v2 Ions in Long Bo Hans Jostlein et al. LAr general
Design/Calculations
LongBow
LAPD
14 Nov 2014
744-v2 Long Bo Feedthrough Design and flanges Hans Jostlein et al. LongBow
LAPD
Feedthroughs
30 Aug 2012
754-v4 Crane for Long Bo installation Hans Jostlein LAPD
Detector
08 May 2012
735-v1 Long Bo in LAPD Drawings Hans Jostlein Cables/Connectors
Cathode/Field cage
LAPD
Feedthroughs
Detector
Bo
14 Jun 2012
258-v1 Bo HV Supply and Lead Hans Jostlein High Voltage
Bo
18 May 2012
687-v2 Long Bo Design Status Hans Jostlein Feedthroughs
High Voltage
LAPD
Detectors
Cathode/Field cage
Photocathodes
Instrumentation
20 Oct 2011
594-v1 A Modular Readout System for A Small Liquid Argon TPC - June 23, 2006 Carl Bromberg et al. DAQ
Bo
Front End
27 Jun 2010
427-v1 Update on Bo Reconstruction Douglas Jensen Pattern Recognition
Bo
23 Apr 2009
393-v13 Bo Run Info Reed Andrews Bo
09 Apr 2009
259-v1 TPC and Electronics in Bo and summary of 1st tracks. Daniel Edmunds et al. Cables/Connectors
High Voltage
Cathode/Field cage
Feedthroughs
Bo
Front End
10 Mar 2009
420-v1 Signal Heights in Liquid Argon tracks Douglas Jensen Pattern Recognition
Signal Processing
24 Feb 2009
412-v1 Fermilab LAr Review Talk Carl Bromberg Fermilab Reviews
New Beams
Event Displays
Instrumentation/Controls
Cold Electronics
Bo
26 Jan 2009
241-v2 Pictures of TPC and feedthru flange for Bo Walter Jaskierny et al. Wires
Feedthroughs
High Voltage
Feedthroughs
Bo
Detectors
Cathode/Field cage
10 Nov 2008
370-v18 Some plots of Run 73 Carl Bromberg et al. Bo
Electrics and DAQ
08 Sep 2008
366-v1 Bo Electronics Safety Review Daniel Edmunds Front End
Electrics and DAQ
09 Jul 2008
229-v1 A Description of the TPC in Bo with a set of mechanical drawings and the internal wiring. Daniel Edmunds et al. Wires
Feedthroughs
Cathode/Field cage
Feedthroughs
Bo
Cables/Connectors
14 Apr 2008
235-v1 Description of Bo TPC and Electronics Daniel Edmunds et al. Pattern Recognition
DAQ
Bo
Front End
14 Apr 2008
350-v3 Test of BO Electronics - getting ready for liquid Carl Bromberg et al. DAQ
Bo
Front End
10 Apr 2008
336-v1 Preliminary Analysis of Bo Pulser Data Douglas Jensen Pattern Recognition
24 Jan 2008
Number of documents found: 22

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

--------
Security, Privacy, LegalFermi National Accelerator Laboratory

DocDB Version 8.8.10, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.23 usr + 0.06 sys = 0.29 CPU)