4649-v1 |
Tall Bo Primary Relief Valve Refurbishment - Test Results |
Kathrine Laureto |
TallBo
|
20 Jul 2020 |
395-v5 |
Pulse Shaping Studies using the FFT |
Carl Bromberg et al. |
Detector Response
Pattern Recognition
Detector Capability
Signal Processing
T962
Bo
ArgoNeuT
Front End
|
07 Feb 2020 |
1853-v1 |
Tall Bo meeting April, 27 2016 |
Stefano Vergani |
LAr general
Detectors
Scintillator
|
27 Apr 2016 |
895-v2 |
Ions in Long Bo |
Hans Jostlein et al. |
LAr general
Design/Calculations
LongBow
LAPD
|
14 Nov 2014 |
744-v2 |
Long Bo Feedthrough Design and flanges |
Hans Jostlein et al. |
LongBow
LAPD
Feedthroughs
|
30 Aug 2012 |
754-v4 |
Crane for Long Bo installation |
Hans Jostlein |
LAPD
Detector
|
08 May 2012 |
735-v1 |
Long Bo in LAPD Drawings |
Hans Jostlein |
Cables/Connectors
Cathode/Field cage
LAPD
Feedthroughs
Detector
Bo
|
14 Jun 2012 |
258-v1 |
Bo HV Supply and Lead |
Hans Jostlein |
High Voltage
Bo
|
18 May 2012 |
687-v2 |
Long Bo Design Status |
Hans Jostlein |
Feedthroughs
High Voltage
LAPD
Detectors
Cathode/Field cage
Photocathodes
Instrumentation
|
20 Oct 2011 |
594-v1 |
A Modular Readout System for A Small Liquid Argon TPC - June 23, 2006 |
Carl Bromberg et al. |
DAQ
Bo
Front End
|
27 Jun 2010 |
427-v1 |
Update on Bo Reconstruction |
Douglas Jensen |
Pattern Recognition
Bo
|
23 Apr 2009 |
393-v13 |
Bo Run Info |
Reed Andrews |
Bo
|
09 Apr 2009 |
259-v1 |
TPC and Electronics in Bo and summary of 1st tracks. |
Daniel Edmunds et al. |
Cables/Connectors
High Voltage
Cathode/Field cage
Feedthroughs
Bo
Front End
|
10 Mar 2009 |
420-v1 |
Signal Heights in Liquid Argon tracks |
Douglas Jensen |
Pattern Recognition
Signal Processing
|
24 Feb 2009 |
412-v1 |
Fermilab LAr Review Talk |
Carl Bromberg |
Fermilab Reviews
New Beams
Event Displays
Instrumentation/Controls
Cold Electronics
Bo
|
26 Jan 2009 |
241-v2 |
Pictures of TPC and feedthru flange for Bo |
Walter Jaskierny et al. |
Wires
Feedthroughs
High Voltage
Feedthroughs
Bo
Detectors
Cathode/Field cage
|
10 Nov 2008 |
370-v18 |
Some plots of Run 73 |
Carl Bromberg et al. |
Bo
Electrics and DAQ
|
08 Sep 2008 |
366-v1 |
Bo Electronics Safety Review |
Daniel Edmunds |
Front End
Electrics and DAQ
|
09 Jul 2008 |
229-v1 |
A Description of the TPC in Bo with a set of mechanical drawings and the internal wiring. |
Daniel Edmunds et al. |
Wires
Feedthroughs
Cathode/Field cage
Feedthroughs
Bo
Cables/Connectors
|
14 Apr 2008 |
235-v1 |
Description of Bo TPC and Electronics |
Daniel Edmunds et al. |
Pattern Recognition
DAQ
Bo
Front End
|
14 Apr 2008 |
350-v3 |
Test of BO Electronics - getting ready for liquid |
Carl Bromberg et al. |
DAQ
Bo
Front End
|
10 Apr 2008 |
336-v1 |
Preliminary Analysis of Bo Pulser Data |
Douglas Jensen |
Pattern Recognition
|
24 Jan 2008 |