This is a scan of the Operational Readiness Clearance for the "Luke Test Installation at Proton Assembly Building." This provides "Authorization to proceed with the unattended operation of the Luke test installation in the Proton Assembly Building." It contains emails from the subsystem reviewers recommending operation and the signatures required by the division.